huntebrücke oldenburg sorted by
relevance

Admin12.07.2021

Top 20 Bike Rides and Cycling Routes around Hunte / Hafen Oldenburg

Technology and dimensions The lifting part of the bridge, built from riveted steel , had a span of 53.
4301
Admin23.07.2021

Bundesautobahn 28

5 minutes in the first lifting stage and around four minutes in the second lifting stage.
100
Admin17.07.2021

Top 20 Most Beautiful Road Biking Routes around Oldenburg

30 Uhr wieder freigegeben werden.
109
Admin01.07.2021

Bundesautobahn 29

This resulted in a clearance height of 8.
9609
Admin03.08.2021

Blick auf die Huntebrücke

In Brake there is still a remnant stretch of about one kilometer from an industrial company, but the siding is no longer used and is closed for business purposes.
1904
Admin07.09.2021

A 29 in Oldenburg: Huntebrücke

During this time the bridge could be opened for shipping.
101
Admin26.06.2021

Oldenburg

Accessed on August 28, 2018.
604
Admin13.08.2021

Blick auf die Huntebrücke

Please check the link according to the and then remove this notice.
3106
Admin06.07.2021

Huntebrück lift bridge

Since it was built by the GOE , the line was operated continuously until 1976.
2406
Admin27.08.2021

Bundesautobahn 28

Construction of the B 212 In the course of the re-routing of federal highway 212, a new bridge over the Hunte was built between 2010 and 2015 to the east of the lift bridge.
1805
Admin12.07.2021

Oldenburg

Current condition Old bridge at Loyerberg over the ski jump The route can be traveled between the Oldenburg main station and the Wehdestrasse level crossing and is terminated there with a buffer stop.
6205